Campo Castilla Project

  • LOCATION: Meta, COLOMBIA
  • TIMEFRAME: 2013 - 2016
General Info
  • Client: Ecopetrol S.A.
  • Plant Capacity: 35 MW. Boilers: Two a heat recovery and a conventional one.
    400 lbs heat recovery time.
    175 psi pressure.
    Temperature: 320 ° C.
  • EPC: Morelco

The project consisted in increasing the reliability and efficiency of the energy generation of the Industrial Services of the Energy and Steam system in the Barrancabermeja Refinery. In addition, it was necessary to reduce the environmental impact. Detailed engineering of the Energy and Steam system (cogeneration), the EPC, pre-commissioning, commissioning and performance tests were carried out. In addition, the Basic and Detail Engineering for the updating of the boilers in Distral B-954/5 was also made.