HDT

  • LOCATION: Santander, COLOMBIA
  • TIMEFRAME: 2007 - 2010
General Info
  • Client: Ecopetrol S.A.
  • EPC: Morelco
Main Quantities
  • Plant Capacity: 33- Electric Pumps
    20- Electrically driven Aero-chillers
    1-Mixer.
    1-Incinerator.
    60,000 ML of poly-cable instrumentation on trays.

The main objective of this project was the construction of the infrastructure to produce clean fuels (300 parts per million (ppm) of sulfur for gasoline, 50 ppm for diesel) to meet domestic demand with a reduction in emissions to The atmosphere of 47 tons of sulfur per day. Not only was the EPC carried out, but also pre-commissioning, commissioning, initial operation, and performance testing.