Maintenance Poliducto de Occidente Project

  • LOCATION: Boyacá, COLOMBIA
  • TIMEFRAME: 2013 - 2018
General Info
  • Client: Ecopetrol S.A.
  • Plant Capacity: 30,000 bpd
  • EPC: Morelco

The main objective of the project was to optimize the production processes in 30K barrels of crude daily with a system that performs the separation and treatment of the well production waters. The engineering services, procurement and construction of the system of production water treatment and crude dehydration following the stages or phases of the system were provided. Associated O & M services were also provided.